15 Bradford Street, Barrie

15 Bradford Street, Barrie

15 Bradford Street, Barrie
A complete building renovation was completed to provide fire safety and a new, efficient HVAC system for a healthcare facility.
Services
Mechanical Engineering
Subservices
Existing Building Systems
Sector
Commercial / Institutional
Duration
2022-2024
Client
Salter Pilon Architects
Project Value
$675,000
Project size
1 building

Pretium was involved in a complete building renovation for the existing office and patient care area at this location.

The building upgrades required the relocation of existing mechanical services, and the addition of a sprinkler system, where no system was previously installed.

Pretium coordinated with the architect, contractor and the City, to provide separate incoming domestic water and fire suppression service lines in separate rooms, to optimize useable space in the existing building.

Additionally, existing gas-fired HVAC equipment was removed and replaced with variable refrigerant flow (VRF) heat pump systems which allowed for precise temperature control in multiple office and treatment spaces.

To deliver this project, Pretium completed the following measures:

Mechanical Design

Mechanical Design

Our mechanical engineering team delivers technically sound, practical, energy, and cost-saving solutions while ensuring our clients’ satisfaction. Our team of highly skilled professionals can provide solutions for any retrofit or new construction project
Contract Administration and Construction Review

Contract Administration and Construction Review

Once a contractor is selected, our team periodically visits the site to confirm that the work is being completed in accordance with the project specifications and provides contract administration from start to completion.

Client Benefits 

Pretium worked with the design team to provide optimal HVAC system design for maximum flexibility, energy efficiency, and greenhouse gas reduction.

From the initial project planning stages, our team was involved with coordinating space planning and site service requirements during the renovations.

This allowed for smooth project progression with coordination between multiple parties, ensuring the safety of building occupants through the installation of fire suppression systems. 

New ductwork and plumbing installed in the ceiling space.
1 / 3
New domestic water softening system.
2 / 3
New domestic water main.
3 / 3