15 Bradford Street, Barrie
Pretium was involved in a complete building renovation for the existing office and patient care area at this location.
The building upgrades required the relocation of existing mechanical services, and the addition of a sprinkler system, where no system was previously installed.
Pretium coordinated with the architect, contractor and the City, to provide separate incoming domestic water and fire suppression service lines in separate rooms, to optimize useable space in the existing building.
Additionally, existing gas-fired HVAC equipment was removed and replaced with variable refrigerant flow (VRF) heat pump systems which allowed for precise temperature control in multiple office and treatment spaces.
To deliver this project, Pretium completed the following measures:
Mechanical Design
Contract Administration and Construction Review
Client Benefits
Pretium worked with the design team to provide optimal HVAC system design for maximum flexibility, energy efficiency, and greenhouse gas reduction.
From the initial project planning stages, our team was involved with coordinating space planning and site service requirements during the renovations.
This allowed for smooth project progression with coordination between multiple parties, ensuring the safety of building occupants through the installation of fire suppression systems.
Your Project, Our Expertise – Let’s Make It Happen