Project Details
Site Drainage Improvements
6 Storey Residential Building
- Poor walkway grading and insufficient drain capacity resulted in overflowing of door threshold at bottom of stairs and flooding into the basement.
- Scope of work included installation of a new trench drain and piping and localized replacement of the walkway at the top of the stairs to direct water past.
- Design and Specifications, Tendering, and Construction Review and Contract Administration.