As one of the largest social housing providers in Ontario, Windsor Essex Community Housing Corporation (CHC) has a deep commitment to sustainability, implementing projects at their existing buildings that are targeting the highest performance levels and creating new high performing buildings. With that in mind, Pretium was selected to be the Prime Consultant to complete CHC’s first Step-Wise EnerPHit project at Riverside Drive.
The project team conducted a feasibility study to determine options for each of the systems requiring renovation. Eighteen scenarios were modeled in PHPP with changes to the:
The design options were narrowed down based on the EnerPHit requirements, impact on residents, and price until an optimal recommendation was achieved. Energy modeling and reporting for the National Housing
Co-Investment Fund was also completed.
Specifications for the renovation were prepared including the preparation of detailed drawings, permit application, and architectural renderings for the new exterior cladding. Construction review and contract administration services
are ongoing with mechanical system installation complete and building envelope upgrades scheduled to be complete in July 2024.
The annual energy consumption is expected to drop approximately
65%
The thermal bridge free design and new continuous fresh air ventilation system combine to significantly improve indoor air quality and occupant comfort.
The annual greenhouse gas emissions are expected to drop approximately
64%
Our expert team is here to help you achieve your goals.
While the project did not specifically target Passive House Certification, the Owners tasked the design team with delivering a building that could achieve Passive House performance levels.
Pretium was engaged to create an energy modeling of the proposed design using designPH and PHPP software to confirm the performance was meeting the stringent targets. During both the design and construction phases, Pretium provided third-party Building Enclosure Commissioning services.
Our role involved reviewing documentation and construction to ensure alignment with the Owner’s Project Requirements.
Pretium also completed air tightness testing on a mock-up unit to confirm that the target of 0.6 ACH @ 50Pa had been achieved. As part of the testing, tracer gas was used to identify deficiencies in the building enclosure. These were then addressed by the Contractor prior to re-testing.
Client Benefits
The Passive House modeling we completed for the proposed design was used to develop insightful recommendations for enhancing the building envelope and mechanical systems before construction commenced. This proactive approach assisted the client in achieving energy performance closer to Passive House standards.
Additionally, Pretium conducted Air Leakage testing during a crucial construction phase, enabling prompt implementation of recommendations to minimize air leakage.
Our expert team is here to help you achieve your goals.
Jennifer believes that at the core of every successful project is a passionate team. She is dedicated to seizing every opportunity to learn new things. One of Jennifer’s favourite things about her career is that she can share her love of the built environment with others. Jennifer is passionate about isotherms, air leakage paths, and baseball.